Thanks guys, what really sucks about the red one is that's the bike that made me decide to start Retro Moto. Oh well, but because it was stolen the green monster was born. A full tank can take from 12 hrs to 30 hrs depending on the shape and finish. I can knock out a mockup piece in a couple of hours. Sometimes I will see the project from a different angle and see something else or get inspired by something and the vision changes.ost of my inspirations are usually not from other motorcycles. It can be a old piece of machinery, old hot rods, or random things I see while riding. But when it changes I just follow it. The only problem with building tanks is too many options,lol. Btw,my bike has been finished for some time now, you can see it on thebikeshed.cc or syb-magazine.com.