Engine fully dissected and nearly everything is in spec!
I dropped off all of the necessary parts with the machinist and the work will (hopefully) be done before the end of the week.
While I was waiting I cleaned up the wheels and washed off all of the hardware. Debating trying my own zinc plating setup to re-plate a lot of the larger pieces of hardware.
Also, unfortunately, getting a hold of new OEM gray cables is darn near impossible, so I've ordered some gray heat shrink to go over the top of the black ones I bought.