waldo101
New Member
Hello everyone, I picked up someone else's unfinished CB250 project yesterday. all the parts come with the bike but everything is rusted so i got the wire wheel out and got to work, I'm almost half way through but still a lot to go. The guy said the engine was running a year ago and it still has the same oil sat in it now, theres no leaks that i can see. Valve covers were somehow snapped around the edges and the tach cable was cut in half with the tach screw in the engine stripped but i managed to get it out. ill attach some pictures of the bike. I was thinking of doing the tank in an army green. the rear swing arm has been extended and has a thick tire, almost looks like a drag bike. any advice what i should look for during this build please let me know, any help will be appreciated. ;D