I don't have as much time to spend on the bikes these days, but I work on them when I can. I've finally completed a full rewire of the Norley using a M-Unit from Moto Gadget, same one as I had fitted to my Merch 131 last year. They make the wiring so much simpler and neater, and also include a built in alarm, so I've just ordered another for the Guzzi. I've not touched the Guzzi for more than a year, but with the Norley almost done (famous last words), the Guzzi has swapped places with the Norley in the conservatory where I can work on it.
Still waiting for the paintwork to be done, I shouldn't have said 'no rush' to the painter.. last August, just called him and been promised it'll be ready the end of next week, but I'm not holding my breath.
Also been doing a few small jobs on the bike, such as adding a stainless screen mesh to the homemade velocity stack and machining a grove in the lock stops to fit an 'O' ring to each to act as a bumper so they wont damage the powder coating on the frame at full lock. Also made a pair of fender mounts which clamp around the fork lowers, means I can use the fender I wanted to use all along. Still lots to do, but (fingers crossed) it'll be running and road legal in time for spring.