Thats cool! How long did it take you?
About 3 months. Bent tubing for floor board mounts, fabricated engine mount, belt tensioner, bent luggage rack tubing, made floor boards & rack slats, lay back seat post... primer, paint, stencil tank logo, pin-striping...
I had an offer of $1000 that I should have taken over the summer. I think I would have broken even.