New Bedlam Werks build: 1999 Yamaha XT600

http://bedlamwerks.com/blog/83-buildprogress1

Stage 7 - 5/12/15

Still moving along on the project. In the past few weeks we have machined new foot pegs and began doing some samples for anodizing, which turned out well. We will be anodizing part of the foot pegs and are currently having the brake lever powder coated, along with the frame, headlight bucket mounts, and heat shield. The gas tank, headlight bucket, oil tank, and airbox are being painted, and we are cleaning the engine and preparing it for painting as well. By next we we should have all the parts back, and will start reassembling the bike and working on final details. The seat pan has been upholstered and we had a matching tool bag made. Getting closer!
 

Attachments

  • for web.jpg
    for web.jpg
    251.7 KB · Views: 235
Stage 8 - 5/29/15

We now have all the powder coated and painted parts back at the shop. The motor is cleaned and painted, and we’ve started reassembling the parts. Exciting stuff! Can’t wait to see the finished product! Follow the link and scroll down to Stage 8 to see all the photos - http://bedlamwerks.com/blog/83-buildprogress1
 

Attachments

  • ksmith_paint_016.jpg
    ksmith_paint_016.jpg
    189.5 KB · Views: 231
  • ksmith_paint_008.jpg
    ksmith_paint_008.jpg
    145.5 KB · Views: 227
  • ksmith_paint_013.jpg
    ksmith_paint_013.jpg
    174.7 KB · Views: 226
  • ksmith_paint_012.jpg
    ksmith_paint_012.jpg
    130.4 KB · Views: 224
  • ksmith_paint_011.jpg
    ksmith_paint_011.jpg
    166 KB · Views: 235
  • ksmith_paint_003.jpg
    ksmith_paint_003.jpg
    155.1 KB · Views: 223
Back
Top Bottom