Yeah, I was already $5k deep on the equipment this was needed to run and 5hp/10 - 15cfm are my minimums. 230v/30a is the voltage requirement which means I will just swap between my kiln and this on that circuit so I don't have to pay a dime towards electrical for a while. At least until I get sick of unplugging my kiln. I run that kiln once or twice a year, since I have work kilns, so I doubt it will be much of a deal.Maritime said:Cool, the one I was lookig at was 2 stage and 35 CFM at 90 psi so a little more oomph. It was also 220 so would have meant some wiring changes in garage too.