As a couch project (i.e. when I'm sitting in front of the tv drinking beer lol) I've designed some upgraded bulbs.. I figure I will be going from at most 1000 mcd to 11000 give or take.
If all goes well I should have the first set built in about a month assuming I can get boards made in 4 weeks.
Cheers
If all goes well I should have the first set built in about a month assuming I can get boards made in 4 weeks.
Cheers