Been working on my Cafe build with my buddy for the past few months. Just thought I would share my progress as I attained alot of inspiration and info from this site during my build. Thanks!

Bike is a 79 CB750F, started off pretty much stock except it had an aftermarket windscreen.
cb1.jpg


The bike has gone through a few stages over the past few months. First was just to remove the rear tail.
cb2.jpg


Then I decided to paint and add clubmans
cb3.jpg

cb6.jpg


I rode the bike like this for a week or so and decided it needed more personality!
 
So I decided to fab up a rear seat!
First was to chop the old seat and mold some expanding foam to get the right shape!
First idea was with a round tail light.....
cb7.jpg

Decided on a rectangular light and shape to match the lines of the tank.
cb9.jpg

Next step was to glass,glaze and paint!
cb35.jpg

cb10.jpg

Now need to get the seat pad professionally covered. My sewing skills are obviously lacking!
 
The new direction!

Was originally going to do an oldschool cafe but found a deal on this CBR F3 that I couldn't pass up, so now we are going to do a complete frame up rebuild and turn this beast into a modern oldschool cafe! CBR F3 Front end, rebuild forks and calipers, polish front and rear wheels, replace rear shocks, and update controls to 600RR. Rebuild engine, port polish head, 3 angle valve job, bore and hone to 4th step pistons as had some minor pitting of cylinder walls, upgrade to 900 cams, upgrade ign to F3 coils, new ricks rotor, cdi boxes, and stator. Upgrade carbs to 98 GSX600 carbs, custom rear set mount to use F3 sets. And various paint and polish work>>>>
Some preview pics
cb12.jpg

cb14.jpg

cb18.jpg

mock up of rear wheel
cb15.jpg

mock up of frontend
cb17.jpg
 
Here are the progress pictures
Engine apart not going open up the case as motor only had 13k miles, but had a leak on lower gasket, hence the teardown.
cb20.jpg

cb21.jpg

Picture of head back from the machine shop 3 angle valve job
cb52.jpg

bored and honed +1mm
cb56.jpg

Painting engine
cb44.jpg
 
Paint scheme stole from wrenchmonkees =).. used color rite paints again and the 2k clear hopefully it hold up! All paint no decals!


cb33.jpg

before clear
cb38.jpg

after clear
cb39.jpg

cb40.jpg

cb41.jpg
 
Okay enough of what i have been working on. This is where I stand today! Valve job done, engine back together and mounted. Rear sets installed, front and rear end mounted and aligned. Still need to redo the wiring as relocating everything under the tail, also running a keyless set up with an alarm activating the ign switch (not autostart). Also going to cover all wiring and cables in stainless steel braid and clear shrink wrap. Also need to rework the BCR headlight bucket and paint to fit my acewell gauge. Then need to mount the carbs, already rebuilt them and installed a jet kit. Hopefully get it running in a week or so!
Rear set mockup still need to polish them.
cb51.jpg

I know you love my fake ohlins rears lol! I'm cheap! Still haven't had someone make my seatpad as well yet!
cb65.jpg

cb66.jpg

cb68.jpg
 
Thanks Yogi!

Here is some pics of this past weeks progress...mocked up the exhaust, battery tray with electronics, and modified the headlight bucket. Also got a spare tank and decided to try and make some knee dents...still needs lots of work!

cb80.jpg

cb81.jpg

cb75.jpg

cb74.jpg

re-glassed and glazed to modify mounting position.
cb77.jpg
 
pics continued...
cb78.jpg

bored out 900 triples also cut off the mounting tabs for the ignition switch so headlight would mount closer to the triples!
cb76.jpg



knee dents attempt will need lots more work on this!
cb71.jpg

cb70.jpg
 
Weekend progress...slow going! Primed the headlight bucket and did a final mock up before painting. Added a hole on the side of the bucket for the clutch cable as it was not clearing the headlight assy.

Also mounted up the GSX carbs, still need to run the fuel lines though.

Finally started on the wiring! This is alot more daunting of a task then I first thought. Hopefully everything works out. repinned the RR controls also made a harness for the acewell gauge. Still need to wire up the alarm, although I made a latch relay to replace the ignition switch, still trying to figure out if i'm going to make an accessory output or not.... Hopefully I can fire this baby up this weekend the weather is terrific right now!

cb87.jpg


cb88.jpg



GSX carbs
cb82.jpg


cb84.jpg

cb83.jpg


Wiring begins.
cb89.jpg

Latch relay switch wired.
cb90.jpg
 
Update! help needed! I got the bike started this past weekend, but noticed that the carbs were flooding after i shut it down. I figure its the float needles or seats or both, but it seems that suzuki only sells the whole float assymebly...does anyone know if I can purchase just the float needles for mikuni BST33s? I've googled it but am getting conflicting information..I believe my bst33 are from a 90-95 gsx600f as they have oval intakes compared to the 88-89 (round intake)...However I can only find float needles for 88-89 gsx600f. If anyone knows where to get replacement needles please let me know. Thanks!
 