Looks like you got a pretty good deal for that price. It looks like the front end has already been gone through, same with wheels, rotors & drums, forks look good, tires look new enough, shocks look good, already has clubman bars on it. That's a great looking tank but did the PO already figure out the mounting or is that up to you? I ask because I see it leaning to one side in at least one of the pics. Anyway, it looks like it was someone else's project bike and they already did a good portion of the hard work. Looks like the only major thing left for you is to do something for the seat along with a lot of smaller stuff. As long as you can get it back running fine I'd say that you did very well.
It appears to still be using the stock airbox which is good for you at this point in your build. I'd suggest getting everything working well as it is before trying to switch to pod filters, if that is what you eventually want to do.
Best of luck to you. Keep the pics and your build log coming.