Re: 1978 cb550k rebuild
::update::
well the jeep is on the back burner but not finished.waiting on parts.
the (shed/about to shop) is almost done. a project to do the project lol.
re framed it, moisture barrier,insulated, put up dry wall and on the 2nd coat of finishing. then paint and install wrap around work bench. hook up breaker box and conduit. should be good by this weekend. then i'll hopefully move the bike over.
::the bike::
found and ordered.
-45 push in slow jets (if needed)
-stainless brake cable
-4 carb rebuild kits
-new cluch, and brake levers
also got in a oil pan the old one was cracked and was welded. looked like a good job but rather get rid of it or keep it as a extra i guess.