Another kick at a rebuild

Well...that about does it for the copper I have. If anyone wants more they'll have to wait ill I get more copper. I usually come across a stick or two every couple of weeks. The pieces are cut. I'll flare and polish them this weekend.

Oi!
 
Canuck Plumber said:
Well...that about does it for the copper I have. If anyone wants more they'll have to wait ill I get more copper. I usually come across a stick or two every couple of weeks. The pieces are cut. I'll flare and polish them this weekend.

Oi!

did ya get my pm ? :)
 
I sure did. Sorry about that.. forgot to reply.... everything is cut and I just need to flare it and polish it then I'll be shipping everything out hopefully by next week. I'll be PMing everyone that asked for a set once they're done letting them know what the deal is with the shipping. If I have any troubles with COD we'll have to make alternate arrangements.
 
Canuck Plumber said:
I sure did. Sorry about that.. forgot to reply.... everything is cut and I just need to flare it and polish it then I'll be shipping everything out hopefully by next week. I'll be PMing everyone that asked for a set once they're done letting them know what the deal is with the shipping. If I have any troubles with COD we'll have to make alternate arrangements.

cool, glad to hear :) mmmm velocity stacks
 
Problems.

I picked up a stick of 2 inch copper and didn't pay attention to what type it was. I need type "L" in order for the copper to flare correctly. I used type "DWV" and the flare is lop sided. So basically I need to get another stick of "L" in order to get you guys some properly flared stacks. I'm pretty sure I can pick up a stick from the supplier in town so I can redo this tomorrow.

In the mean time I fabricated some copper sleeves to fit the neck of the stacks and adapt them to the carbs. I need to finish polishing them.

IMG_3198.jpg


IMG_3197.jpg


IMG_3196.jpg


Push and push and push till it hurts......
Hello time bomb... I'm ready to go off....
 
Yep - I definitely need a set of these for my VM36 Mikunis (and my VM34's) - you could sell these things on eBay!
 
Looks like the O.D. on the intake of my VM34's is 58mm or 2.28 inches. The VM36's are at 62mm (2.44 inches)... any copper that size?
 
Swagger said:
Very cool looking. Are you planning to solder the two pieces together?

Yep, I used a technique called cosmetic soldering. (a fancy way of saying that I soldered the inside seam only so you can't see the solder.)

HerrDeacon said:
They look awesome. Need to polish up the carbs now. Really nice work.

Thanks. I'm trying to set up a jig in my workshop to get all these out at once. Once I get the right copper I should be able to pound out all 27 of them in a relatively short period of time.

Tim said:
Looks like the O.D. on the intake of my VM34's is 58mm or 2.28 inches. The VM36's are at 62mm (2.44 inches)... any copper that size?

Yea, as Swagger pointed out, they can stretch (not flare) the pipe out by about a 1/4 - 1/2 inch. The DWV I cut would split but the type "L" will stretch no problem. The length of the stacks are about 4 inches so you should be able to stretch the pipes enough without warping the flare. As for selling them on ebay... I kinda burned that bridge by telling them to Fak off. They had it coming in my books but......
 
Well if you need a conduit to eBay, I'd be happy to list them for you - I'm in good with them and have over 300+ feedback.
 
Thanks Tim. I'm not using them out of principle and trying my damndest to not become a hypocrite. However... money talks... I'll keep your offer in mind...
 
Ok. I have the bugs worked out and a rig set up to pound out these stacks. I've cut all the copper and just need to flare and polish. I bought a gear press to use with the flaring tool to make these go out easier. I got six done tonight an 21 to go.
 
Some complications with my wife's pregnancy has cut my free time considerably. I spent some time flaring the stacks this weekend and I have finally sorted out the electrical problems by completely rewiring the bike. I'd HIGHLY recommend anyone who is rebuilding their bike to go this route rather than try to monkey with the existing harness. It has been done many times by other people on this forum and I now understand why. It sounds daunting, but once you get your head around the layout of your bike it's pretty simple. I'll post pics later.

Another week or so and the stacks will be ready to ship.

By the way.... WE GOT THE CUP!
 
Canuck Plumber said:
Some complications with my wife's pregnancy has cut my free time considerably. I spent some time flaring the stacks this weekend and I have finally sorted out the electrical problems by completely rewiring the bike. I'd HIGHLY recommend anyone who is rebuilding their bike to go this route rather than try to monkey with the existing harness. It has been done many times by other people on this forum and I now understand why. It sounds daunting, but once you get your head around the layout of your bike it's pretty simple. I'll post pics later.

Another week or so and the stacks will be ready to ship.

By the way.... WE GOT THE CUP!

is your wife alright ?
 
Canuck Plumber said:
Some complications with my wife's pregnancy has cut my free time considerably. I spent some time flaring the stacks this weekend and I have finally sorted out the electrical problems by completely rewiring the bike. I'd HIGHLY recommend anyone who is rebuilding their bike to go this route rather than try to monkey with the existing harness. It has been done many times by other people on this forum and I now understand why. It sounds daunting, but once you get your head around the layout of your bike it's pretty simple. I'll post pics later.

Another week or so and the stacks will be ready to ship.

By the way.... WE GOT THE CUP!

Oh man, don't spend too much energy on the stacks, sounds like you have far more pressing things to think about on the home front. I hope all turns out well amigo! Will be sending good energy your way..
 
Back
Top Bottom