It's really starting to take shape. I made a decision this week to go pickup a gas bottle for my MIG welder and instead of subing out the work I'm going to finish weld the project myself... I'm no professional but I thought about it and, the only way I'm going to get better is to do it. Who cares if the welds aren't perfect at least I know when riding it that I did it all myself. Given that and not having to send it out I should have it on the road by the end of August!
[The bars came in from TC Bros. I couldn't have asked for a more perfect fit and look! I decided to use the factory Honda controls to save on cost and stay true to the vintage look of the bike. The 12" rise is just right for my height of 5'8" and the end result is an extremely comfortable riding position.]
[The linkage system is completely finished and turned out great. The action is so smooth... Sleeving the aluminum with steel tubing really made the difference as you can see. It'll be powder coated black to match the frame. The zinc coating on the HEIM joints will also polish off and end up to a chrome like silver finish.]
[I ended up getting a longer bolt for the bowcrank. I found that when tightening it down the action got very rough. I'm going to use two nuts on the longer bolt and allow for a little bit of slop. With the set screws on the tabs its plenty secure.]
[I had to cut the factory brake rod and tap it to 6MM joining it with the aluminum tube that connects to the aft HEIM joint. It's all nicely slid inside the steel tube and locked up with red threadlock and nuts.]
[Here's a closer shot of one of the forward controls. They need to be finish polished but you get the idea. I had some aluminum rod knurled and tapped and it worked perfectly. The key with these is the skateboard bearing that rest in the pivot point.

]
[In this shot you can see the rear fender. It still needs to be shaped more but this is the rough mock-up. Not bad for a $29.00 trailer fender from TSC eh?]
[This is the faux oil bag which will hold the battery, electronics and a few simple tools. It's a piece of 6" OD thinwall tubing. It needs to be blasted still and have a set of caps made up for it. I'm going to cut pieces of 1" DOM to sleeve the bolts with and when tightened from inside it should give a solid yet still removable fit.]
[For keeping things legit I had to come up with somewhere to mount the brake switch. I ended up being able to hide it on the right side interior of the axle plates. I made up a new tab and it will connect to a spring which locates on the aft brake linkage rod. Every time you pop the brake it'll light up. By doing it this way I can also run the wires up through the frame to the electronics bag for a cleaner look.]
More to come next week....
Thanks for looking!
Jason