Soo unfortunatly due to new job i havmt been able to work/post as much as i wanted but update is here!
Cylinders have gone to the machinist and are going to .25 over and i should have them back soon! Couldn't find a replacement camshaft or followers so they went to joy engineering for a resurfacing etc.
ive finally got all those pesky old gaskets off and joining surfaces are clean, bought a valve spring compressor and removed valves, all looks within spec but with lots of carbon built up so that was cleaned and i shall lap them tomorrow.
Polishing engine cases is almost finished and i have got new fork seals and shall be replacing them soon!!
Tank has also been stripped mostly, finding decent paint stripper in England was a massive pain but it got done in the end. Starting to clean all engine for paint.
And have been buying materials for forming a seat, slipstream rearsets are on their way along with a few other goodies, a bit of a rushed update but more shall follow with better pics too!!!