Linkage Extension

SkiMan

Active Member
In the process of having to extend the shift linkage and was wonder how I fiqure the new length that I'll need. Do I need to set the gears to 1st or neutral and then take my measurements from fully threaded connections or is the measurement something less then fully threaded.... this seems more appropriate, but how much less off of fully threaded at either end?

Thanks
SkiMan
 
leave it in neutral fit engine end then think 'parallelogram'
The foot lever arm and gearchange arm should be at same angle, you can us ruler to measure required length of link

PJ
 
regardless of what gear your in, the shifter always stays in the same spot ! extend your linkage so you have the shift lever were you want it ,and the throw arm on your shifter shaft in the correct position,,,,,the rear brake is a harder to figure out, especially when using a brake rod
 
crazypj said:
leave it in neutral fit engine end then think 'parallelogram'
The foot lever arm and gearchange arm should be at same angle, you can us ruler to measure required length of link

PJ

Ok... I get the parallelogram portion and the fact that I'll fit the engine end of the linkage 1st.
Do I need to leave any "later adjustment capability" in the length of the rod once I've fittted the foot lever portion of the connection or is it simply a matter of once fitted, no further adjustment?

Me thinks I may be using too many brain cells and making it harder than it really is.

Thanks PJ
 
Ok Wee Todd, you outlined what I was thinking as I was typing my reply.

For some reason though the rod linkage on the brake side doesn't seem to alude me like the shift linkage. The rod link has a treaded adjustment and it seems more of a matter of getting the correct (most comfortable) foot position.

Now its just a matter of hunting down acouple of left hand dies to cut new threads.

Thanks
SkiMan
 
I like Victor Machinery Exchange in New York.
They have stuff for threading I couldnt find anywhere else in USA.
They do have a minimum order though ($30.00 I think)
If you look them up online its keeping below $X,000 is the problem, not finding $30.00 worth of stuff you need ;D

PJ
 
PJ, thanks for the lead on Victor Machinery. I don't really want to go overboard on the threading stuff ($), but I figure it's worthwhile having as I got another project waiting in the wings.

Thanks again
SkiMan
 
PJ, just had to let you know that I found the left hand dies at Victor Machinery Exchange.
Exactly what I was looking for at a fairly decent price. Ordered the items late friday nite
and they arrived this afternoon (tuesday).
Thanks again for the recommendation
SkiMan
 
Back
Top Bottom