SLOWWWWW....... we built a shop this summer, I built a different bike and the GT has been on the back burner.....I have a tail section made that will work for now and a decent tank. The frame spent most of the summer in the sand blasting cabinet.... to help prevent it from rusting... the frame is mostly done, de-tabbed, gussets put in, the rear of the frame was re-worked for the tail section. Im hoping to get more experience with fiberglass and mold making so i can make the tank i want. This winter We need to get it finished, the motor ran good so hopefully apart from putting everything back together i think its possible...