So how much of this did I get done LOL. the infection coming back sure did impact trying to get this all done in 13 days.
TO DO:
Wiring - all systems, new gauge, required lights to be legal. NOPE
Brakes - Front bled, rear checked, new rear line can wait. NOPE
Cables - New throttle cables installed, clutch checked and lubed, choke mounted and lubed. One thing
Seat - GL1100 pan modded to fit 1000, foam carved, some kind of cover - OK got the leather at least for this
rear fender - mounted - NOPE
Rear lights - tail and turns mounted, may need to use leftovers temp for now. - NOPE
Mount exhaust. HALF!
Make bracket for heal toe and mount. NOPE
However things not on list done were new clutch perch and brake/clutch levers mounted. And swapped out bent kick stand for straight one of the 1100.
Other:
Fix broken sparkplug wire, clean drain holes in Head, change oil, re-fill coolant. check clamps for leaks
Wow, let's see if that can get done in 13 days with the gimp leg. Apparently not much, but any forward motion is good.
I have 2 days to get it done for a day trip, not likely but I will try as one day is a Sat. The dad in law helped with some hard stuff for me to do alone as well which leaves easier stuff for me.