My first ever project: GS450T

Today's jobs

So I thought I'd make the most of today's 6 degree weather... Readjusted the gear shifter pedal as the previous was way too uncomfortable. Also bled the front brake. The I took off the tacho and associated wiring from the headlamp housing. When I get access to a hacksaw I'll modify the instrument bracket so that I'm left with the speedo part of the bracket only. Still waiting on my tusk light control unit.
 

Attachments

  • image.jpg
    image.jpg
    914 KB · Views: 169
Little update

Hey guys. So I've ground the instrument bracket to just the speedo bit. Received my Tusk switchgear, and it was not plug and play! I had to figure out the wiring from the loom connection under the tank and customise it to fit. I have now been able to correctly place the clutch lever for much safer riding. Installed some led indicators too.
 

Attachments

  • image.jpg
    image.jpg
    2 MB · Views: 175
Back
Top Bottom