Winter project CB550

u9e3ejur.jpg


Tonight ill do the front tire
 
I am going to continue commenting because this was the first build I saw when I originally joined and it has been a build I continually look for to see if there are any updates. Looking good man, keep it going.
 
qunubu9y.jpg
e9ybepyd.jpg
e2ehynep.jpg


As promised earlier, I am now ready to fulfill the rest of my hub order. Hub reuses stock GSX-R bearings, axle, rotors, and seals. This exact hub works with:

2005 - 2007 GSX-R1000
2006 - 2007 GSX-R750
2006 - 2007 GSX-R600

The same axle is used for later yrs but rotors are 6 bolt instead of 5 bolt.

Color options are black anodize or bare aluminum. 40 hole or 36 hole option is also available. No modifications are needed. Just lace desired rim (stock or not stock) to hub and it bolts right up.

Price is $349.00 and will take about 30 days to come in. If you have another year GSXR or CBR you would like a hub for I can get some measurements and have those manufactured as well. Please shoot me a message if you are interested.
 
hows your front wheel spoke clearance? i had to mill down the backside of my calipers because it was dangerously close to the spokes..
 
MJPriceisright said:
hows your front wheel spoke clearance? i had to mill down the backside of my calipers because it was dangerously close to the spokes..

When I did the spacing on spokes I took that into account so that they had plenty of clearance. Hard to get a pic though.
 
If I was going with this option I would definitely hit you up. For future reference is there a minimum amount of units that need to be ordered?
 
reflexsilver said:
If I was going with this option I would definitely hit you up. For future reference is there a minimum amount of units that need to be ordered?

I currently have to order 9 more hubs.
 
reflexsilver said:
Can't wait to see the heart mounted in this and it all come together!

Me either! Motor should be goin back together next week depending on parts coming. I'm going to go ahead and replace primary chain, hone bore and replace rings since motor is all apart. Then frame off to powder coat and tank off to paint.

Took these pics yesterday since she rolls now
a5ananut.jpg
uny9u4er.jpg
ajaqany4.jpg
 