Its been 3 weeks since the purchase and I've managed to order about 80% of all the new parts! Which include new handle bar grips, brake master cylinder and clutch levers, braided black brake lines, black exhaust wrap, LED brake light, new chain, steering bearings, crank case filter, pod air filter.
Ive wrapped one of the exhausts and shaped it the way I want it. I will eventually build my own baffle to decrease noise and keep it legal. The gas tanks needs a rust removal and sealant but unfortunately my new puppy decided to steal the keys and bury them. Will be heading into a locksmith soon to have a key re cut for both the ignition and gas tank.
The frame has had a lot of paint removed and will be going in to be sand blasted and powder coated black.
Ive had experience with using fibre glass and tomorrow will consist of making a mould for the fibre glass seat pan.
The wiring harness will be re wrapped in a black heat shrink tubing.
Please give any tips or ideas, anything and everything is appreciated!