fiberglass, seat foam, batting, and fabric for the top cover
last night got the new master cyl on, braided lines, rebuild the calipers, new brake pads, coated and installed the rotors, coated the speedo gear that now just acts as a spacer, got the pipes on wiht the baffles removed... new shorted kick stand that has be coated... all i have left to do is pull the carbs while i have it all apart, make sure everything is tight (have a slight drip durring warm up) set the floats... install them back in there and then sync them... and slap on the new fender...and she is good to go till winter where rotors will be drilled, digital guage set up will be made to sit inside the tank, LED kit, and who knows what else