Thanks to everyone for sticking with me through this drawn out process, but the drill is complete! The final assembly went fairly smooth without any major complications. I got the table cleaned up with a few scotchbrite pads and penetrating oil, wiring was pretty simple and now everything manipulates smoothly, the spindle has .002 run-out with a .25 drill rod so I am happy about that. When fired up she runs nice and smooth through the entire speed range. I put the Heinrich 8SV vise on the table that came with the drill, but it also came with a 4-inch version not in the picture.
I moved the drill about 250 miles to Northern Michigan on Tuesday (loaded up Monday night) from the school shop up to my dads house where it is going to stay until I can get a proper shop set up. I borrowed a trailer and a pallet jack, loaded up with a fork lift, and taken off with a cherry picker up north. Thankfully the trip went without incident!