'75 cb200t cafe build

Thanks Guys! I made a set of piston stop plates this morning and rounded up my ring compressors, could be a good day.
Kev
 
Progress, hopefully cylinder gets slid on this morning before I start the night shift tonight.
Kev
pistoninstall002.jpg
 
It must be really nice to have all those tools and skills. I really envy those exhaust collars. Nice work!
 
Thank you for the kind words MBS! I hope to work on getting the cam installed this weekend. At that point, should be getting close to putting the engine back in the frame.
Kev
 
I got this Dyna S coil off of ebay new out of the package for $26.00 and got it mounted today
Kev
DynaS003.jpg
 
A good weekend. This morning, i got the head torqued, valves set and points gap set. This afternoon I covered the frame rails up and hung the engine. I may get this thing done someday!
Kev
enginehung002.jpg
 
Tonight I fiddled around with making a set of plug wires. 7mm solid core with NGK caps. I made a rubber liner for inside the battery tray and made a ground cable. I'm working on the shift linkage now. Next step is to weld two little stops on the header pipes and I'll be able to install the exhaust.
Its nice putting parts on that don't have to be taken off again! Looks like I'm actaully doing something, hahaha
Kev
 
Back
Top Bottom