ok... well i set up shop outside cause it was 50 degrees... i got the seat sanded down and primed.... still needs to be sanded again and glazed, primed and painted but it was a great start! also finished both sides of the linkage... just need to powder the brake side
(sorry about the crap pics all i have is my cell, girl has the camera in TN this weekend)
shifter side
brake side (needs pow wow)
(sorry about the crap pics all i have is my cell, girl has the camera in TN this weekend)
shifter side
brake side (needs pow wow)