Re: My new workshop (it has begun)
Ok, so my remesh arrived today with the setting chairs and I picked up the tie wire and mark out paint, looks like I will have heaps to do this weekend! so the plan will be to drill set in all the rebar to the existing garage slab and the new side footing, mark out the chair and height set locations before I slide the remesh into place. Then I have to finish the formwork along the footing wall ready for the concrete pour on the 28th. As a side project to this I also have a bit of concrete work to do around the back door area of the house, because I get a new workshop the Wife gets a new deck covering the entire area between the house and the workshop, so because I have planned drainage under the deck, it has to be concreted under it, lucky for me most of the area has already been done! anyhow here are a couple of pics including the small old deck I had to remove before and after.