Managed to steal some free time this weekend and get stuck into the bike, mainly working on the wiring loom, when I was getting the tank made, I forgot to leave the Cdi unit fitted hence, not enough room now on the opposite side of the frame to the coil to fit the Cdi, so that now has to be moved back down under the saddle, no major problem just extended the connector block, soldering the joins to be sure to be sure, as they say here in Ireland.....I also found some cloth tesa tape on fleabay and have finished off the loom from the headstock back to the battery....some pic attached...I also managed to get the engine running over the weekend albeit badly,and on used oil...ran for about 15 minutes very very rich,,,exhaust note is nice...but lots more work to be done..oil dropped now.....so need to concentrate on the build again....I have worked out a mechanism for the rear brake...and intend to get that fabricated up this week sometime....if that works, I will need to then figure out how to run a brake light switch...