Got some little things done tonight, and got a lot of small things done last saturday.
On saturday I sorted out the rearset mounts, cut and finished the gear linkage, some other small things and did a lot of measurments for making some new parts.
Made two new parts tonight, the seatpan and the extension/conversion mount for the rear shock.
The seatpan will get 1 1/4" foam on top, be completely dressed in leather with tuck-and-roll on top
I'm also planning to use orange thread and orange piping ( since the color of the gastank and upper frame tube will be an orange color)
I had to make an extension and conversion for the rear shock mount. To get the right hight on the bike, also the right movement for the rear swingarm linkage, I made an 3" extension. This also twists/converts the holes 90 degrees to fit the frame and shock together. Tried fitting it, and it was the perfect length
Next on the list is more fabrication of parts. Mounts for the rear brake master, mount for the rear brakefluid reservoir, extension to get the headlight a bit higher and a mount for the ignition. Unfortunately I will be abroad for a week from Sunday, so there will nothing done for two weeks :-/
Until next time!!